Skip to content

Arizona Preliminary Twenty Day Notice

Arizona Revised Statutes section 33-992.01 makes the preliminary twenty day notice a necessary prerequisite to any claim of lien, and it has to reach four parties by mail, with proof of mailing under section 33-992.02. Attorney review available.

Find out where you stand in Arizona

What is your role on the construction project?

DocDraft provides document preparation, not legal advice.

Introduction

Four parties have to be served with an Arizona preliminary twenty day notice, and the fourth is the one that catches people out. A.R.S. section 33-992.01(B) lists the owner or reputed owner, the original contractor or reputed contractor, the construction lender if any or reputed construction lender, and the person with whom the claimant has contracted for the purchase of the items. Most states stop at three. Arizona adds your own customer, which means the subcontractor who hired you gets a copy as a matter of statute, not courtesy. The same subsection makes service a necessary prerequisite to the validity of any claim of lien, and section 33-981(D) tightens it further: a person required to give the notice can enforce lien rights only if he has given the notice and has made proof of service under section 33-992.02. One class is carved out at the front of the sentence, a person performing actual labor for wages. Arizona then controls delivery narrowly. Subsection F allows first class mail sent with a certificate of mailing, registered mail or certified mail, postage prepaid, to the recipient's residence or business address, and service is complete the moment the notice is deposited in the mail. Subsection D supplies a form the notice must follow substantially, including a bold-faced statement that opens by saying this is not a lien, and a paragraph in the largest type on the page that puts the owner under a ten day duty to correct your facts or lose inaccuracy as a defense. DocDraft builds your Arizona notice from your facts, with attorney review available before you mail it.

Key Things to Know

  1. 1

    Arizona's instrument is the preliminary twenty day notice, and section 33-992.01(B) makes serving it a necessary prerequisite to the validity of any claim of lien. Four parties receive it: the owner or reputed owner, the original contractor or reputed contractor, the construction lender if there is one, and the person with whom the claimant contracted.

  2. 2

    That fourth recipient is the Arizona difference. Your own customer, the party you sold to, is a statutory recipient. A supplier who notifies the owner, the general contractor and the bank but not the subcontractor who placed the order has not served the list subsection B sets out.

  3. 3

    Only one class is excused: a person performing actual labor for wages. Everyone else furnishing labor, professional services, materials, machinery, fixtures or tools is inside subsection B, including design professionals and equipment suppliers.

  4. 4

    Mail is the method. Subsection F allows first class mail sent with a certificate of mailing, registered mail or certified mail, postage prepaid in all cases, addressed to the person's residence or business address, and service is complete at the time of deposit in the mail. Keep the mailing paperwork, because it becomes the attachment to your proof.

  5. 5

    Proof is a separate requirement, not an afterthought. Section 33-981(D) lets you enforce only if you both gave the notice and made proof of service under section 33-992.02, which wants an acknowledgment of receipt signed by the recipient, or, if none comes back in thirty days from mailing, an affidavit of the person who mailed it with the certificate of mailing or the certification or registration receipt attached.

  6. 6

    The notice puts the owner under duties too. Ten days after receiving it, or after receiving a written request from someone intending to give it, the owner or other interested party must furnish the jobsite description and the names and addresses of the owner, the original contractor and the construction lender, plus a copy of any payment bond recorded under section 33-1003.

  7. 7

    Since Laws 2024, Chapter 89, a typography slip no longer sinks the notice. Subsection I provides that an otherwise compliant notice is not defective for failing to use bold-faced type, or type at least as large as the largest type on the document, or both. The content itself is still mandatory.

Key decisions before you file

Before you file a Preliminary Notice in Arizona, a few decisions shape the document: which option to choose and what each one means. The Preliminary Notice guide walks through them.

Open the Preliminary Notice guide

Customize your Preliminary Notice Template with DocDraft

Arizona Requirements for Preliminary Notice

  • Four Recipients Under Section 33-992.01(B)

    The owner or reputed owner, the original contractor or reputed contractor, the construction lender if any or reputed construction lender if any, and the person with whom the claimant has contracted for the purchase of the items. Four, not three. Serving the notice is a necessary prerequisite to the validity of any claim of lien.

  • Your Own Customer Is a Statutory Recipient

    The fourth name on the subsection B list is the person the claimant contracted with. A supplier that notifies the owner, the original contractor and the construction lender but not the subcontractor who placed the order has not served the list Arizona sets out.

  • Only Actual Labor for Wages Is Carved Out

    Subsection B begins Except for a person performing actual labor for wages. Everyone else furnishing labor, professional services, materials, machinery, fixtures or tools is inside the requirement, including design professionals and equipment suppliers. Section 33-981(C) and (E) separately deny lien rights to an unlicensed contractor and to a person furnishing professional services without a valid certificate of registration.

  • Mail Only, and Service Is Complete on Deposit

    Subsection F permits first class mail sent with a certificate of mailing, registered mail or certified mail, postage prepaid in all cases, addressed to the person's residence or business address. Service is complete at the time of the deposit of notice in the mail. Hand delivery is not among the methods the subsection names.

  • Proof of Service Is a Condition of Enforcement

    Section 33-981(D) allows enforcement only where the claimant has given the notice AND made proof of service under section 33-992.02. Proof is an acknowledgment of receipt in substantially the statutory form, or, if the recipient does not complete and return it thirty days from the date of mailing, an affidavit of the person who mailed it showing time, place and manner, each recipient's name and address and the capacity in which notice was given, with the certificate of mailing or the certification or registration receipt attached.

  • Three Blocks of Prescribed Language, Plus the Subsection D Form

    The notice must follow substantially the form in subsection D, headed Arizona Preliminary Twenty Day Lien Notice. It opens with the statement that this is not a lien and not a reflection on the integrity of any contractor or subcontractor, carries the bold-faced Notice to Property Owner warning with its three suggested protections under section 33-1008, and carries a paragraph in the largest type on the document about the owner's ten day duties. Subsection D also directs that the acknowledgment of receipt language from section 33-992.02 be inserted into the notice.

  • The Owner Owes You the Job Details on Ten Days Notice

    Subsection J gives the owner or other interested party ten days from a written request by a person intending to give the notice, or ten days from receiving the notice, to furnish the jobsite description, the names and addresses of the owner or reputed owner, the original contractor or reputed contractor and the construction lender or reputed construction lender, and a copy of any payment bond recorded under section 33-1003 with the surety and bonding agent details. Subsection K provides that failure to answer does not excuse timely service but stops the owner raising any inaccuracy in the notice as a defense.

  • One Notice Per Job, Until the Price Moves Thirty Percent

    Subsection G lets one notice to each of the four recipients cover everything furnished for the building, structure or improvement, unless the actual estimated total price exceeds by thirty percent or more the total price in any prior notice, or the items are furnished under contracts with more than one subcontractor. Subsection H protects you below that line: a notice is not defective because items later furnished fall outside the general description or exceed the estimate by less than thirty percent. Subsection I, added by Laws 2024, Chapter 89, saves an otherwise compliant notice from a bold-face or type-size slip.

Frequently Asked Questions